INCOMAPUTO RIVER BASIN

Informations générale
Carte de localisation
Nom de l'organisation
IncoMaputo Watercourse Commission
Adresse
 
Courriel de l'organisation
 
Nom du responsable
 
Année de création
1993
Contacts
Superficie totale
77400km²
Linéaire de cours d'eau
810Km
Nombre d'habitants
3 257 000million d'habitants
Pluviométrie
 
Cultures irriguées
 
Agriculture non irriguée
 
Site Internet
Bassin
 
Couverture géographique

The Incomati watercourse is the system of the Incomati River, which includes the tributaries Mazimechopes, Uanetze, Massintonto, Sabie, Crocodile, Komati Rivers, and the estuary and the Maputo watercourse is the system of the Maputo River, which includes the tributaries Pongola and Usuthu Rivers, and the estuary.

Pays riverains
Pays Superficie
Mozambique
16100km²
Centrafrique
47700km²
Swaziland
13600km²
Pays
 
Fonction/mandat

The TPTC is an advisory committee without executive powers. It advises the contracting parties on technical, legal, administrative, and other reasonable measures related to the development and management of the Incomati and Maputo watercourse systems and it is to remain in force until superseded by another comprehensive water agreement.

Structure organisationnelle

The Tripartite Permanent Technical Committee is the only organ established by the Interin IncoMaputo Agreement as an advisory committee without executive power

Structure organisationnelle de la coopération

The Tripartite Permanent Technical Committee (TPTC), which was established in 1983, is the joint body for cooperation covering the Incomati and Maputo Rivers.
The Interim IncoMaputo Agreement reestablished the TPTC as an advisory committee without executive power. The joint body is supposed to meet at least twice
a year with the purpose of implementing the Interim IncoMaputo Agreement. The Chairman-ship and the venue of meetings rotates among the signatory states.

Plan de gestion et programmes d'actions

In the Interim IncoMaputo Agreement, the three governments agreed on a list of “Reference Projects” to be implemented.
Based on determining criteria, Reference Projects are mentioned for Mozambique, South Africa and Swaziland.

Monitoring et système d'information

The parties were required to exchange available information and data regarding the hydrological, geo-hydrological, water quality, meteorological, and environmental
conditions of the watercourses in order to enable planning, development, and management of the shared watercourses.
Any planned water resource development and water utilization projects would only commence if the provisions of the Revised SADC Protocol on the procedures of
notifying other Riparian Countries of planned measures had been complied with.
Prior to signing the Interim IncoMaputo Agreement, the TPTC had already adopted the “Resolution on the Exchange of Information and Water Quality.” However measures were also instituted to establish regular comparable monitoring systems, methods and procedures; and to report on the status and trends of the associated aquatic, marine, and riparian ecosystems.

Régles de prises de décision et procédure d'arbitrage

The TPTC shall adopt – by consensus – its rules of procedure that will govern the meetings. The Interim IncoMaputo Agreement further stipulates that any dispute shall be settled amicably through consultation and negotiations among the parties. In cases in which a dispute is not settled within one year of the date upon which such negotiations were requested, it may be submitted for arbitration by either Party. If the disputing parties do not agree on the subject matter of the dispute, the arbitration tribunal shall determine the subject matter according to its rules.

Financement des structures de coopération

The 1983 Agreement stipulates that each government shall bear the cost of its representatives and the cost of any person it wishes to appoint as advisors. No specific
provisions are mentioned in the Interim IncoMaputo Agreement of 2002 on funding.

Participation des parties prennantes

No specific provisions.

Historique de la coopération

In 1999, the TPTC decided to include the Maputo River system and to conduct a Joint Maputo Basin Study, which was completed in 2001. This decision broadened the
agenda, which so far had mainly focused on the Incomati River. After more than three years of negotiations, the ministers of the riparian states signed the Interim IncoMaputo
Agreement in 2002. Its major achievement was that the riparian states agreed on previously disputed hydrological data, a number of water management/environmental
measures and a water sharing formula including secure water supply to Maputo city.

Date Nom du traité Signataires Bassin
1983-02-17
Tripartite Technical Committee
Mozambique
South Africa
Swaziland
-
1991-02-15
Water Ministers Meeting
Mozambique
South Africa
Swaziland
Incomati, Komati
1992-03-13
Joint Water Commission Treaty
South Africa
Swaziland
Komati, Maputo
1992-10-07
Utilizaton of Komati Water Resources Agreement
South Africa
Komati, Kangwane
2002-08-29
IncoMaputo Agreement
Mozambique
Swaziland
South Africa
Incomati, Maputo
Challenges

Underdeveloped Mozambique not party to KOBWA, the river basin organization mandated to operate the dams, insufficient flow for environmental requirements, member states at different stages of development and insufficient funding.